Grupo Server runs two industrial parks: Server Industrial Park in Arteaga, Coahuila (500 ha, 2014) and Server Industrial Park SLP (525 ha, 2018).

By the Grupo Server editorial team · Editorial policy

Published · Updated

Grupo Server runs two industrial parks, according to its corporate information current as of September 2026. Server Industrial Park is in Arteaga, Coahuila: it opened in 2014 and covers 500 hectares. Server Industrial Park SLP is in San Luis Potosí: it opened in 2018 with 525 hectares and a 110 million dollar investment. Together they total more than 1,000 hectares and host over 25 international manufacturing companies.

Key facts

  • Server Industrial Park, Arteaga, Coahuila: opened in 2014 and covers 500 hectares.
  • Server Industrial Park SLP, San Luis Potosí: opened in 2018 with 525 hectares.
  • Investment in the San Luis Potosí park: 110 million US dollars.
  • Combined: more than 1,000 hectares and over 25 international companies.
  • Operator: Grupo Server, founded in Saltillo in 1966.

Where is Server Industrial Park Arteaga and how big is it?

Server Industrial Park sits in Arteaga, Coahuila, along the Saltillo–Ramos Arizpe automotive corridor. It is the group's first park and the one that marked its entry into the industrial sector: it opened in 2014 with a total area of 500 hectares.

The company that develops and operates it —Server Industrial Park, incorporated that same year— works with three occupancy formats:

  • Developed land, for companies building their own plant.
  • Build-to-suit facilities, designed around the client's process.
  • Inventory buildings for immediate occupancy.

Its tenants include Lear, Emerson, Bendix and Mando.

Park State Opened Area Operating company
Server Industrial Park Arteaga, Coahuila 2014 500 ha Server Industrial Park
Server Industrial Park SLP San Luis Potosí 2018 525 ha Server Industrial Park SLP

Both parks are presented on Grupo Server's industrial parks page.

What does the San Luis Potosí park offer?

Server Industrial Park SLP opened in 2018 and is the group's industrial expansion into San Luis Potosí. It sits five kilometers from the BMW and General Motors plants, has a total area of 525 hectares and represented a 110 million dollar investment. To date it has delivered more than 100,000 m² of buildings, including those for Lear, VOSS and Valtic.

The San Luis Potosí operation lists three capabilities: turn-key projects, in-house design and engineering, and land sales and leasing. Design and engineering are done in-house, not subcontracted.

Alongside that sits Net Power, a group company in the same industrial parks line.

Which companies operate in the parks?

The companies established in Grupo Server's parks that are named in its public content are:

  • Lear Corporation
  • Emerson · Copeland
  • Bendix
  • Mando
  • VOSS Automotive
  • Turck
  • Dong Yang Piston
  • Sangsin Brake
  • CJ Logistics
  • Perrigo

Add Valtic to that list, a company the San Luis Potosí park built a facility for. Grupo Server reports more than 25 international companies hosted across the two parks, so the list above is the publicly identified portion, not the full roster.

The BMW and General Motors plants are five kilometers from the San Luis Potosí park; Grupo Server describes that area as the BMW–GM cluster.

Why the Saltillo–Ramos Arizpe–Arteaga corridor?

Because it is the automotive corridor where Grupo Server has been operating for six decades, and where the Arteaga park sits. The group was founded in Saltillo in 1966 with Server Construcciones —land development, paving, bridges and industrial buildings— and today it is nine companies across four sectors, with offices in Saltillo on Blvd. Manuel Gómez Morín.

The other half of the answer is the supply chain. Triturados Gramol produces gravel, sand, ballast, base and asphalt mix at two plants, one in Coahuila and one in San Luis Potosí —precisely the two states where the parks are. Promotora Server has manufactured block, brick and pavers since 1982; Server Construcciones builds industrial buildings, develops land and paves; Urbanizadora Server enables land. These are in-house capabilities, in the same two states.

The corridor is backed by public figures. The Coahuila State Development Plan 2023-2029, 2025 update, defines the Southeast Region —Arteaga, General Cepeda, Parras, Ramos Arizpe and Saltillo— around the automotive, construction and energy industries, and counts 1,031,779 inhabitants in the Saltillo metropolitan area based on the 2020 Census. Industry has been there for decades: the General Motors complex in Ramos Arizpe started operations in 1981, and Stellantis has built engines in Ramos Arizpe since May 1981 and in Derramadero, Saltillo, since October 2010.

In that same southeast Coahuila corridor the group also develops residential communities, such as Lomas del Valle in Ramos Arizpe, which its own project page places at the heart of the area's industrial growth.

How do you request land or a building?

Through the contact form on the site, at gruposerver.com.mx/en/contacto. There is also a direct sales line: ventas@gruposerver.com and +52 844 450 2000, Monday to Friday, 9:00 AM to 6:00 PM.

It is worth stating what is not published, because it is what almost everyone asks first: price per square meter or per hectare, sites available right now, build-to-suit delivery timelines, and state or municipal tax incentives. None of that appears in Grupo Server's public content. Grupo Server quotes it directly through the contact form, case by case, depending on site size, format (land, inventory building or build-to-suit) and park —Arteaga or San Luis Potosí.

To make the first email useful, bring three things: the approximate area you need, whether you are after land or a building, and which park interests you.

Frequently asked questions

How many industrial parks does Grupo Server have?

Two parks in operation: Server Industrial Park in Arteaga, Coahuila (opened 2014) and Server Industrial Park SLP in San Luis Potosí (opened 2018). Together they total more than 1,000 hectares.

How large is each park?

Server Industrial Park Arteaga has a total area of 500 hectares. Server Industrial Park SLP has 525 hectares and represented a 110 million dollar investment.

How close is the San Luis Potosí park to BMW and General Motors?

Five kilometers from the BMW and General Motors plants, in what Grupo Server describes as the BMW–GM cluster.

Does Grupo Server lease or sell buildings as well as land?

Yes. In Arteaga it offers developed land, build-to-suit facilities and inventory buildings for immediate occupancy. In San Luis Potosí it handles turn-key projects, in-house design and engineering, and land sales and leasing.

Where can I find pricing, available sites and delivery timelines?

They are not published. Grupo Server quotes them directly through the contact form.

Topics

  • Grupo Server
  • Server Industrial Park
  • Arteaga
  • San Luis Potosí
  • Coahuila
  • BMW
  • General Motors

Sources

Spotted an incorrect fact? Tell us the article title through the contact form.

Keep exploring the site

Related articles