Stages to build a house in Saltillo: from land to handover
Building a house in Saltillo follows 7 stages: design, permits, foundation, shell, rough-in and finishes, with a permit required for 60–1,000 m².
Blog topic
Grupo Server's construction and infrastructure line acts as a contractor for public and private works: land development, paving, bridges and industrial buildings. Server Construcciones, the group's founding company, handles land development, paving, bridges and industrial buildings. Urbanizadora Server handles land enablement and development for residential communities. This section gathers the articles on the process, permits and timelines of building a home in Saltillo — from permit to handover — and on how a community's land is developed before its lots go on sale.
Building a house in Saltillo follows 7 stages: design, permits, foundation, shell, rough-in and finishes, with a permit required for 60–1,000 m².
The major building permit in Saltillo costs $94 for the application and $94 for inspection in 2026, plus $39.22/m² in H1/H2 zones.
Build time for a house in Saltillo depends on floor area, climate and permits; frosts run from November to February (IMSS, 2016).
Land development for a residential community includes layout, water, drainage, power, pavement and green areas; Urbanizadora Server has done it since 2002.