# Building in Saltillo: stages, timelines, permits and land development

Grupo Server's construction and infrastructure line acts as a contractor for public and private works: land development, paving, bridges and industrial buildings. Server Construcciones, the group's founding company, handles land development, paving, bridges and industrial buildings. Urbanizadora Server handles land enablement and development for residential communities. This section gathers the articles on the process, permits and timelines of building a home in Saltillo — from permit to handover — and on how a community's land is developed before its lots go on sale.

## Questions this topic answers

- [What are the stages to build a house in Saltillo?](https://gruposerver.com.mx/en/blog/etapas-para-construir-una-casa-en-saltillo/)
- [What exact requirements does the major permit ask for?](https://gruposerver.com.mx/en/blog/licencia-de-construccion-en-saltillo-requisitos/)
- [What determines how long it takes to build a house?](https://gruposerver.com.mx/en/blog/cuanto-tarda-construir-una-casa/)
- [What does land development for a community include?](https://gruposerver.com.mx/en/blog/que-es-la-urbanizacion-de-un-fraccionamiento/)

## Construction process and permits

- ConstructionSeptember 2, 2026

  ## [Stages to build a house in Saltillo: from land to handover](https://gruposerver.com.mx/en/blog/etapas-para-construir-una-casa-en-saltillo/)

  Building a house in Saltillo follows 7 stages: design, permits, foundation, shell, rough-in and finishes, with a permit required for 60–1,000 m².

- ConstructionSeptember 2, 2026

  ## [Building permit in Saltillo: requirements and costs for 2026](https://gruposerver.com.mx/en/blog/licencia-de-construccion-en-saltillo-requisitos/)

  The major building permit in Saltillo costs $94 for the application and $94 for inspection in 2026, plus $39.22/m² in H1/H2 zones.

- ConstructionSeptember 2, 2026

  ## [How long it takes to build a house in Saltillo: what determines it](https://gruposerver.com.mx/en/blog/cuanto-tarda-construir-una-casa/)

  Build time for a house in Saltillo depends on floor area, climate and permits; frosts run from November to February (IMSS, 2016).

## Land development

- ConstructionSeptember 2, 2026

  ## [What land development for a community includes](https://gruposerver.com.mx/en/blog/que-es-la-urbanizacion-de-un-fraccionamiento/)

  Land development for a residential community includes layout, water, drainage, power, pavement and green areas; Urbanizadora Server has done it since 2002.

## Keep exploring the site

[See construction](https://gruposerver.com.mx/en/construccion/)[Contact Grupo Server](https://gruposerver.com.mx/en/contacto/)

[All blog articles](https://gruposerver.com.mx/en/blog/)

---